Jinzhou Julei Building Materials Co., Ltd

15003211888

Polyvinyl chloride adhesive

6

Instructions for Use

1.  For old cement concrete, the aged joint filler and debris in the joints should be removed, and the joints should be kept dry, with a moisture content less than 6%.

2. The new cement concrete should be cleaned after sawing the joint.

3. Can adapt to the deformation caused by load and temperature changes inside the wallboard, and maintain the sealing and waterproof performance of the joint.

4. the finished PVC putty into  , slowly heat up, keep stirring, the temperature should be controlled at 120℃ when melting, the highest temperature should not exceed 160℃, to ensure that the joint filler does not foam does not emit yellow smoke, thick smoke, if the above situation is found, it should be immediately annealed, accelerate stirring, the melted joint filler can be used any time and new materials can be added, continuous operation. Avoid long-term heating to prevent changes in the performance of the joint filler. The melted joint filler should be immediately poured into the joint with a pot, the joint filler should be flush with the road surface, and the excess material should be removed with a shovel to maintain driving.

5. After each shutdown, the grout adhered to the pot should be cleaned up to avoid affecting the quality of the new grout mix

6.  After the construction of the clay is completed, it takes about 10 hours to dry, and the next step of construction can be carried out after is dry.